Technical
When installing your Rooflight/skylight please ensure it isfitted with the correct fall to allow water to run off the glazing. The recommended gradient is 40mm for every 1000mm to run in accordance with the fall of your roof.
We advise if you have any concerns before you silicone the skylight glazing in place, a simple water test can be carried out by pouring water on the highest point of the skylight and look for any pooling as the water runs away
1.
2.
3.
4.
Now proceed to finish your roof covering up to the top of your easy fit kerb and joist/up-stand.
5.
Apply structural glazing silicone to both flat surfaces of the kerb and the corner of the rebated glassunit.
6.
Position the skylight glazing into the upstand (please note depending on the size you have purchased this may require up to six people on site) ensuring the step of the glazing is set inside the rebate of the upstand
7.
Position the skylight glazing into the upstand (please note depending on the size you have purchased this may require up to six people on site) ensuring the step of the glazing is set inside the rebate of the upstand
8.
Position the skylight glazing into the upstand (please note depending on the size you have purchased this may require up to six people on site) ensuring the step of the glazing is set inside the rebate of the upstand